Future Plan
- Home
- / Future Plan
What We are Planning?
We would like to build G+2 (ground plus two) for Class rooms, which can hold 400 students from grade 1-8.
We will have Staff building of G+2 (ground plus two), and this building will include different laboratories for the students, offices, registration, HR admin, administration… etc.
There will be game zone for the students.
Two different Toilet for each sex (Female And Male)
We will build G (ground floor) Dining hall with two different partitions and each hall will accommodate 200 people.
Small Guard House at the main gate.
Small clinic for emergency case.
For construction we need 4,361.6 area
The short term construction will cost us 10,047,917 ETB
The short term project and administration 10,280,000 ETB
Food cost per child * day *Child number = Monthly cost 60*26*400= 624,000 ETB Per Month, We need 624,000 Birr per month for breakfast and lunch for 400 children.
Middle term plan
We would like to build G+4 (ground plus four) for Class rooms, which can hold 600 students from grade 1-8.
We will have Staff building of G+4 (ground plus four), and this building will include different laboratories for the students, offices, registration, HR admin, administration… etc.
There will be game zone for the students.
Two different Toilet for each sex (Female And Male)
We will build G+1 (ground plus one) Dining hall with four different partitions and each hall will accommodate 150 people.
Small Guard House at the main gate.
Small clinic for emergency case. We will feed 600 students with breakfast and lunch. And this will cost us 1million ETB per month.
Long Term Plan
Block 1
This block is ground plus two (G+2) building.
It holds 240 students, at the first floor there will be four class rooms and each hold 30 students. Also in the second floor there will be four class rooms and each holds 30 students.
The ground will be for biology and chemistry laboratories.
Block 2
This block is ground plus two (G+2) building.
It holds 240 students, at the first floor there will be four class rooms and each hold 30 students. Also in the second floor there will be four class rooms and each holds 30 students.
The ground will be for IT room.
Block 3
This block is ground plus two (G+2) building.
It holds 240 students, at the first floor there will be four class rooms and each hold 30 students. Also in the second floor there are four clasrooms and each holds 30 students.
The ground will be for Art gallery room.
Staff Bulding
This building is ground plus six (G+6)
Each floor will have four office rooms
Each offices will hold four person
All administration system will run from this office
In this staff building School director, HR admin, unit leaders… etc, will be included.
The ground floor will be a place of rest and entertainment for the staffs.
Dining Hall
This building will be ground plus one (G+1) with a total of four hall.
Each dining hall accommodates around 200 people. The ground will accommodate around 100 people.
This dining hall accommodates a total of 800 people.
Library
Thus building will be ground plus three (G+3)
The ground, first floor and second floor will be library and the third floor will be meeting hall.
It includes discussion rooms for students.
All the necessary resources will be included.
Staff Bulding
This building is ground plus six (G+6)
Each floor will have four office rooms
Each offices will hold four person
All administration system will run from this office
In this staff building School director, HR admin, unit leaders… etc, will be included.
The ground floor will be a place of rest and entertainment for the staffs.